Health and Safety Executive (HSE) have released guidelines relating to the selection and installation of barrier glands.
These guidelines identify that Duty Holders should apply the Informative National Annex of BS EN 60079-14: 2014 as Relevant Good Practice when assessing the requirements for fitting a barrier gland to electrical equipment in potentially explosive atmospheres.
Please see below for the guidelines in full:
Use of Barrier Glands in Potentially Explosive Atmospheres to meet IEC 60079:14 2013 (Edition 5)
Health and Safety Executive – Safety Notice
| Department Name: | HID CEMHD (E,C&I team) |
| Bulletin No: | HID 1-2016 |
| Issue Date: | 1 February 2016 |
| Target Audience: | Chemical processing and production Engineering Warehousing Offshore Others: Duty holders designing, installing, inspecting and maintaining electrical equipment in potentially explosive atmospheres COMAH Duty Holders and operators installing and maintaining electrical equipment in explosive atmospheres: |
| Key Issues: | There is currently a key difference between the current IEC 60079-14: 2013 Standard and previous versions of BS EN 60079-14: 2008 & IEC 60079-14: 2007 for use of electrical equipment in potentially explosive atmospheres in that the IEC Standard currently allows the Duty Holder to use a ‘standard’ Ex certified flameproof gland as opposed to a Ex certified ‘barrier gland’ without the requirement to apply the previous flowchart used in the British Standard which identified glanding requirements based on gas group / zone / enclosure size. There is evidence that this approach creates a fire and explosion risk and this Notice provides Duty Holders with information on what action to take. |
Introduction
There is currently a key difference between the current IEC 60079-14: 2013 Standard and previous versions of BS EN 60079 -14:2008 & IEC 60079- 14: 2007 for use of electrical equipment in potentially explosive atmospheres in that the IEC Standard currently allows the Duty Holder to use a ‘standard’ Ex certified flameproof gland as opposed to a Ex certified ‘barrier gland’ without the requirement to apply the previous flowchart used in the British Standard which identified glanding requirements based on gas group / zone / enclosure size. There is evidence that this approach creates a fire and explosion risk and this Notice provides Duty Holders with information on what action to take.
Background
The current International Standard, IEC 60079-14: 2013 Standard allows Duty Holders to use a ‘standard’ Ex certified flameproof gland as opposed to a Ex certified ‘barrier gland’ without the requirement to apply the previous flowchart used in the British Standard which identified the glanding requirements based on gas group / zone / enclosure size, provided that the Duty Holder uses:
IEC 60079-14: 2013, Clause 10.6.2
b) Cables and glands meeting all of the following:
There is credible independent evidence that this approach poses a risk of fire propagation through the cable sheath (after multiple ignitions) and therefore such a scenario may pose an ignition risk if the new IEC Standard is applied by Duty Holders, i.e. no barrier gland is used.
The 2014 version of BS EN 60079-14 does mirror the IEC Standard in respect of the above clause and requirements in the ‘Normative’ body of the Standard, however this version also contains a National Annex (NA) (see p138 onwards) that acknowledges the British Standards Institution’s (BSI) concerns over the application of the IEC Standard to the use of barrier glands (see below). Reference to this National Annex is also clearly stated in the ‘National foreword’ of the British Standard:
NA.4 UK committee concerns
1.The UK Committee is not aware of any issues (either unsafe or over-engineered situations) relating to the use of the selection chart since its adoption in the UK in 1989 and subsequent international adoption in 1996.
2.The UK Committee have not seen documented evidence of any tests carried out to justify either the removal of the selection chart or its replacement by the new selection procedure.
3.Verbal descriptions of recent tests seem to suggest that tests only relate to ignitions through the cable. The original ERA research project highlighted that severe thermal damage can be inflicted on the core insulation and bedding by the heat generated by multiple explosions within the enclosure. This could result in subsequent catastrophic failure of the cable leading to ignition of the surrounding atmosphere.
4.The selection chart only applied to flameproof enclosures which contained a source of ignition in normal operation, but the new procedure applies to all flameproof enclosures. Previously all junction boxes and indirect entry terminal boxes did not require barrier glands; however, under the new edition, unless the cable is at least 3m in length, a barrier gland will be required. The UK committee is unclear as to the justification for this change given that potential failures only arise after multiple ignitions.
Note 1 The new edition seeks to clarify the requirement for the cable to be at least 3m in length by referencing the new Annex E of the Standard. Annex E is titled “Restrictive breathing test for cables” and prescribes pressure drop tests with the cable connected to an enclosure. However, as this annex is informative, it is not clear whether cables will require testing to avoid the need for a barrier gland. The UK committee is of the opinion that such testing is not reasonably practicable.
AND
NA.5 Recommendation by the UK committee for users of this Standard and notice of future intent
At the moment this issue is being escalated by the BSI Technical Committee and the British Standard is also clear (although this National Annex section is ‘Informative’) that Duty Holders should continue to consult the existing flowchart (i.e. the selection chart – included in the NA annex Figure 1) to determine if a flameproof ‘barrier’ gland should be used.
Action required
HSE recognises the risks identified by the BSI Technical Committee and also has further independent 3rd party evidence that supports the BSI’s conclusions.
In order to ensure that this risk is suitably controlled, the HSE has defined the ‘Informative’ National Annex of BS EN 60079-14: 2014 as an ‘Established Standard’ (see http://www.hse.gov.uk/enforce/emm.pdf [1] ) as it is considered to be a “published or commonly known standard of performance interpreted by HSE as a level of performance needed to meet a general or qualified duty under health and safety“.
Duty Holders should therefore apply the Informative National Annex of BS EN 60079-14: 2014 as Relevant Good Practice when assessing the requirements for fitting a barrier gland to electrical equipment in potentially explosive atmospheres.
References
Control of Major Accident Hazards Regulations (COMAH) 2015
Dangerous Substances and Explosive Atmospheres Regulations 2002
BS EN 60079 -14: 2014 (National Annex)
Further information
Contact the HSE’s CEMHD Electrical, Control and Instrumentation team for further information on the subject or visit http://www.hse.gov.uk/eci/index.htm[2]
General note
This Safety Notice should be circulated to all relevant Duty Holders / Employees that are involved in the design, selection, installation, inspection and maintenance of electrical equipment in potentially explosive atmospheres.
EXCELLENT
Based on 38 reviews
Posted on Googlemichael casson11 March 2026Trustindex verifies that the original source of the review is Google.
Great presentation by the instructors and prep for Compex 01 - 04 examination. Highly recommendedPosted on GoogleViaceslav Gaiducenia12 January 2026Trustindex verifies that the original source of the review is Google.
I did compex 01-04. English is not my first language. I got extra support, a bit of extra explonation, extra advice. All of this was super helpful. The instructors were very knowlagable, passionate and well tempered. I failed one of the units but I passed it second time.Posted on GoogleCameron Bowyer18 November 2025Trustindex verifies that the original source of the review is Google.
I had an excellent experience training with EPIT Aberdeen. The instructors were incredibly knowledgeable, professional, and clearly passionate about what they do. The facilities and equipment are top-quality, and the training was delivered in a way that was both practical and engaging. Everything was explained thoroughly, with real-world examples that made the content easy to understand and apply. The staff were friendly and supportive throughout, creating a really positive learning environment. I left feeling confident, well-prepared, and genuinely impressed with the standard of training. Highly recommend EPIT Aberdeen to anyone looking for high-quality, industry-leading courses.Posted on GoogleShawn Clark12 September 2025Trustindex verifies that the original source of the review is Google.
Done the CompEx Ex01-Ex04 with Mike and Dodd, and they were both excellent! They both broke things down and made them easier to understand, as well as being genuinely good people who you can have a normal conversation and laugh with!Posted on GoogleJohn Soutar11 June 2025Trustindex verifies that the original source of the review is Google.
An absolutely brilliant training and test facility that made the dreaded "Compex Refresher" course, a far more enjoyable and beneficial experience. From the great training material to the very knowledgeable instructors, it all helped to teach us about the new practices and standards in Compex and I certainly left knowing more than I did when I walk through the door Monday morning. Thanks to the all staff! 5*Posted on GoogleQuinn MacDonald30 April 2025Trustindex verifies that the original source of the review is Google.
Excellent facilities and the instructors were brilliant at teaching you the course materials along with real world advice and practicesPosted on GoogleAndrei Lerca4 March 2025Trustindex verifies that the original source of the review is Google.
Great training center powered by passionate people and a very beautiful reception.Posted on Googlejames Lombardo27 November 2024Trustindex verifies that the original source of the review is Google.
Most reliable and Very professionalPosted on GoogleAlistair Strachan (Ally)17 September 2024Trustindex verifies that the original source of the review is Google.
Been here twice, superb facilities and certainly the best out of the 3 different venues I've attended for compex.
Please complete the form below and a member of our admin team will contact you regarding available dates.
Read EPIT Group’s full Terms & Conditions and Privacy Policy.
Gases & Vapours (EX01 – Ex04)
Electrical / Instrument Craftpersons & Engineers Install, Inspect & Maintain: Gas & Vapours
| Header Column #1 | |
|---|---|
| Industries | Principal to all Ex environments, with direct application in hazardous vapour and gas environments. |
| Entry Qualifications Guidance | Level 3, ECS Gold Card, National Diploma or equivalent.
Disipline:
|
| Entry Knowledge - Expected |
|
| Entry Skills - Expected |
|
| Job Roles Aspiring to or operating in |
|
| Entry Experience Guidance |
|
| Entry Knowledge - Desirable |
|
| Entry Skills - Desirable |
|
Gases & Vapours (EX01 – Ex04)
Electrical / Instrument Craftpersons & Engineers Install, Inspect & Maintain: Gas & Vapours
| Header Column #1 | |
|---|---|
| Industries | Principal to all Ex environments, with direct application in hazardous vapour and gas environments. |
| Entry Qualifications Guidance | Level 3, ECS Gold Card, National Diploma or equivalent.
Disipline:
|
| Entry Knowledge - Expected |
|
| Entry Skills - Expected |
|
| Job Roles Aspiring to or operating in |
|
| Entry Experience Guidance |
|
| Entry Knowledge - Desirable |
|
| Entry Skills - Desirable |
|